When might we see batch 4?


#1

Got the okay from the wife just wondering when we will see batch 4 open up?


#2

We still got to get batch 3 all shipped out. The new throttle controllers are taking a bit longer then we expected (needed a few extra revisions). So for the batch 4 time frame we are looking at about 4-5 weeks.


#3

Perfect can spend winter getting it ready for spring. Is there any way for you to ship the bonka batteries to Canada?


#4

Can you describe what is different in the throttle control from previous batches? What improvements that have been made?


#5

Better :rofl:
Cheers


#6

Built in BEC and ESC ports directly on the board:


#7

Here’s a peak from hot off the manufacturing line.
This is a batch of new frame PCB that will but cut up into individual boards.

What do you guys think of the color? :slight_smile:


#8

Where do you get the boards manufactured? And do you have the components come already soldered onto the PCB?

(Curious for my own variometer project.)


#9

We ended up going with PCBWay.
They do manufacturing and assembly in house so it’s nice and turn-key.

Another good option for first projects is https://www.seeedstudio.com/fusion_pcb.html

It’s much more expensive to have assembly done vs doing it yourself (the boards themselves are pretty cheap) but we wanted to ensure high quality and consistency.


#10

Looks awesome!! Is this the final revision? When do you think batch 3 will start shipping out?


#11

As Paul said here -


We’re still looking at roughly 4 weeks to get the controllers all in, at which time we will send out batch 3.

In more detail, the frame PCBs are on their way from the factory and the rest of the PPG parts look good to go. So while we wait for the controller manufacturing we will continue to get as much as possible pre-assembled so everything can get shipped to customers as soon as possible.


Batch 3 expected delivery